i got the back wall done.  i glued small square dowels to the top and bottom of the frame and then trimmed the skewers the right length before gluing them on.  it’s a good thing i didn’t make the wall any higher or i would have had to piece it.  the skewers were just long enough to fit.  i really lucked out there since i didn’t think to check before making the frame.  i think i need to glue a crossbeam across the middle of that wall to even out some of the warping.  i picked the slats that were the straightest end to end, but didn’t check for bowing.

noah insisted on helping, but was so tired towards the end he fell asleep.
Leave a Reply